The Director-General of the National Communications Authority (NCA), Ing. Edmund Yirenkyi Fianko, has raised concern about frequent fibre optic cable cuts, warning that the incidents are affecting the quality of telecom services across the country.
According to him, construction works by road contractors and other utility providers are a major cause of the disruptions, which often lead to slow internet speeds and service interruptions.
Ing. Fianko made the remarks in an interview with Moro Awudu on Good Morning Ghana on Metro TV on Friday, March 13.
He explained that modern telecommunications networks rely heavily on fibre optic connections to link mobile towers to the wider network.
“As we provide high-speed data, we need to have these fibre cables connecting the mobile towers,” he said.
However, he noted that construction activities frequently damage these cables, disrupting services for users.
“We have fibre cuts from a lot of construction providers who dig and cut the cables and cause disconnection of the service,” he said.
Ing. Fianko explained that while telecom networks are designed with backup systems, these alternatives usually have lower capacity.
“Normally we have to have backup,” he said. “Fibre is the primary and then the microwave is the backup. But fibre has more capacity than the radio.”
As a result, when fibre lines are cut and networks switch to backup connections, customers may experience slower speeds or reduced service quality.
“If the fibre is cut, it will impact the service,” he said.
He disclosed that the authority recently received complaints about poor network performance and investigations revealed that multiple fibre cuts had occurred.
“There have been several fibre cuts,” he said.
He added that when fibre rings are damaged in more than one location, a large number of telecom sites can be affected at the same time.
“If you have a fibre ring and it is cut in two places or three places, a whole number of sites can be cut off from the network,” he explained.
To address the situation, the NCA is engaging road construction agencies and contractors to ensure better coordination when excavation works are carried out.
The NCA boss said closer collaboration with institutions such as the Ghana Highways Authority and feeder roads agencies will be necessary to reduce the incidents and protect critical telecommunications infrastructure.





