Taxi drivers at the Madina Market station, under the Ghana Private Road Transport Union (GPRTU), have issued an urgent appeal to the La Nkwantanang-Madina Municipal Assembly, requesting immediate improvements to the drainage systems around the area.
The drivers have raised serious concerns about the persistent flooding at the car park, which occurs every time it rains, disrupting operations and inconveniencing passengers.
The drivers explained that overflowing gutters and inadequate drainage have caused regular flooding, turning the taxi station into a chaotic and unsafe area whenever there is rainfall. These conditions not only affect their ability to work efficiently but also negatively impact the passengers who use the station, creating safety hazards and unnecessary delays.
“We are constantly battling floods at this station. Every time it rains, the whole car park is submerged, and it takes hours for the water to drain away. This is affecting our daily operations and causing huge losses,” one of the concerned drivers shared.
In addition to the drainage issues, the drivers also voiced their frustration with the ongoing delays in the completion of the Madina Market project. They stated that the construction delays have worsened congestion in the area, with the limited available space at the station now stretched to its limits. The drivers are urging authorities to expedite the project’s completion, as the overcrowding is further complicating the situation.
“We’ve been dealing with this congestion and flooding for too long. The market project is supposed to ease things up, but the delays are only making it worse. We need solutions now,” another driver emphasized.
In response to the concerns, a representative from the La Nkwantanang-Madina Municipal Assembly, Billy Blay, assured the public that steps were being taken to address the issues. He confirmed that the Assembly is working on expanding and upgrading the drainage systems around the station to reduce flooding. Blay also highlighted that efforts are underway to alleviate congestion, with the Madina Market project being prioritized for completion.
“We are aware of the challenges faced by the drivers and passengers at the Madina taxi station. We are committed to improving the infrastructure and ensuring the safety and convenience of everyone who uses this space,” Blay stated.





